MOC 2012 postponed to October
Upon instruction of the Ministry of Petroleum of Egypt, MOC 2012 has been postponed from 22-24 May 2012 to October 2012
Upon instruction of the Ministry of Petroleum of Egypt, MOC 2012 has been postponed from 22-24 May 2012 to October 2012
Oil and gas company, Cameron, outlines its current projects and future prospects in Nigeria and beyond
Fairstar Heavy Transport, has won a US$2.6mn contract for the transport of jack up drilling rig, Hercules 185
A heavy duty ID clamping pipe milling end prep tool that can bevel, face and bore all hard pipe alloys including stainless steel, super duplex and P-91 is available from Esco Tool
On average, oil and gas companies, and water/wastewater industries, use six per cent of their annual income to combat corrosion; here are some of the causes and preventatives.