EGYPT HAS GIVEN preliminary approval to sending Jordan more gas through the Arab gas pipeline project, according to reports.p>EGYPT HAS GIVEN preliminary approval to sending Jordan more gas through the Arab gas pipeline project, according to reports.
Gas
3rd well on Ain Tsila
PETROCELTIC HAS ISSUED an operational update on its Isarene permit in the Illizi Basin in South Eastern Algeria. As previously announced, a gas column in excess of 80 meters
Chevron JV spending $2.3bn to cut flaring in Angola
CHEVRON CORP’S CABINDA joint venture is spending US$2.3bn over five years to reduce flaring
Angola LNG partners contract
TOTAL E&P ANGOLA and BP Angola (Block 18) BV let a contract to Acergy SA for the installation of more than 70 km of pipeline from Angola’s Block 2 to the onshore pipeline for the 5.2 million tonne/year Angola LNG liquefaction facility near the town of Soyo in Zaire province.
Petroceltic tastes gas in Ain Tsila
DUBLIN-BASED PETROCELTIC International has found gas in the AT-1 probe drilled to test the Ain Tsila field in Algeria’s Isarene permit.