Upon instruction of the Ministry of Petroleum of Egypt, MOC 2012 has been postponed from 22-24 May 2012 to October 2012
Technology
Cameron outlines operations in West Africa
Oil and gas company, Cameron, outlines its current projects and future prospects in Nigeria and beyond
Fairstar wins Hercules rig contract
Fairstar Heavy Transport, has won a US$2.6mn contract for the transport of jack up drilling rig, Hercules 185
End prep tool for pipe milling on oil rigs
A heavy duty ID clamping pipe milling end prep tool that can bevel, face and bore all hard pipe alloys including stainless steel, super duplex and P-91 is available from Esco Tool
Pipeline corrosion and how to prevent it
On average, oil and gas companies, and water/wastewater industries, use six per cent of their annual income to combat corrosion; here are some of the causes and preventatives.